Scheduling Of Pipeline Construction Under Space Constraints
碩士 === 國立中興大學 === 土木工程學系所 === 104 === How to arrange limited resources in order to achieve the shortest working periods has continually been a very important research area for construction industries. This study first deeply investigated a NISSAN motor lab case. There are 13 types of pipelines which...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/83186101917406983725 |