Discussion on the Taipei MRT tunnel safety test and evaluation of outcomes
碩士 === 中國科技大學 === 土木與防災設計系 === 104 === The construction of Taipei Rapid Transit Systems started in December1998 and the accumulative operation length is 129.2 Km in November 2014. Some sections of tunnel structures may have deteriorated and need to be repaired. This study focuses on three areas, se...
Main Authors: | LIN,SONG-JHIH, 倪嵩智 |
---|---|
Other Authors: | Hsiao,Hsin-Tai |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/56633757212259587518 |
Similar Items
-
Ground movements due to shield tunnelling for taipei MRT system
by: Lin, Shi-Jie, et al. -
Ground Movements due to Shield Tunnelling for Taipei MRT System
by: Shyh-Jye Lin, et al.
Published: (1993) -
Ground movements due to shield tunnelling of contract CH221 for Taipei MRT system
by: Song, Jia Lin, et al.
Published: (1995) -
Ground settlements due to shield tunnelling for Taipei MRT system
by: SU,QI-XIN, et al.
Published: (1991) -
The Study of Shield Tunnel of MRT Construction Safety Management
by: Shu-Tsarng Huang, et al.