Discussion on the Taipei MRT tunnel safety test and evaluation of outcomes
碩士 === 中國科技大學 === 土木與防災設計系 === 104 === The construction of Taipei Rapid Transit Systems started in December1998 and the accumulative operation length is 129.2 Km in November 2014. Some sections of tunnel structures may have deteriorated and need to be repaired. This study focuses on three areas, se...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2016
|
Online Access: | http://ndltd.ncl.edu.tw/handle/56633757212259587518 |