Analysis of Tilted Primary Diaphragm Wall in Very Soft Clay

碩士 === 國立臺北科技大學 === 土木與防災研究所 === 103 === Diaphragm wall panels are constructed in alternating method (or Pilgrim) in Taiwan. Two adjacent primary panels are placed leaving out the secondary panel in between. The initial setting time of concrete in secondary panel at lower curing temperatures estimat...

Full description

Bibliographic Details
Main Authors: Kai-Chih Hsu, 許凱智
Other Authors: James C. Ni
Format: Others
Language:zh-TW
Published: 2015
Online Access:http://ndltd.ncl.edu.tw/handle/p6u2pm