The study of the placement of operators, job design and standard time measurement of an assembly line - Using Lego production as an illustration
碩士 === 國立屏東科技大學 === 工業管理系所 === 102 === To assign equivalent jobs to every workstation to achieve line balancing based on the average time of standard workers. But these arrangements didn’t consider the different production rate between standard workers and other workers. Therefore it will affect the...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2014
|
Online Access: | http://ndltd.ncl.edu.tw/handle/c44bu6 |