Research on Two-Stage Dynamic Scheduling System for Re-Entrant Flow Shop.

碩士 === 國立屏東科技大學 === 工業管理系所 === 102 === The contents of abstract in this thesis: The Re-Entrant WIP will arise from scheduling conflicts with the original WIP in the production system as well the system result a bottleneck. Resulting in the order delay of shipping and workstation to be too much WIP o...

Full description

Bibliographic Details
Main Author: 李政勳
Other Authors: 黃祥熙
Language:zh-TW
Published: 2013
Online Access:http://ndltd.ncl.edu.tw/handle/92311476226542259022