Research on Two-Stage Dynamic Scheduling System for Re-Entrant Flow Shop.
碩士 === 國立屏東科技大學 === 工業管理系所 === 102 === The contents of abstract in this thesis: The Re-Entrant WIP will arise from scheduling conflicts with the original WIP in the production system as well the system result a bottleneck. Resulting in the order delay of shipping and workstation to be too much WIP o...
Main Author: | |
---|---|
Other Authors: | |
Language: | zh-TW |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/92311476226542259022 |