Finding Semi-Active Schedules for Job Shop Scheduling Problem with Minimum and Maximum Time Lags
碩士 === 國立中央大學 === 工業管理研究所 === 102 === We consider the job shop scheduling problem with minimum and maximum time lags while minimizing the makespan. This problem typically arises in a manufacturing environment where the next operation has to be carried out within a specific time range after the compl...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | en_US |
Published: |
2014
|
Online Access: | http://ndltd.ncl.edu.tw/handle/69318980755857467935 |