Discounted Cash Flows Time-Cost Trade-Off Problem Optimization with Uncertainty Cost
碩士 === 國立交通大學 === 土木工程系所 === 102 === Optimization problems in time-cost trade-off (TCTO) analysis of construction management have been traditionally solved by two distinctive approaches: heuristic methods and optimization techniques. Although heuristic methods can handle large-size projects, they do...
Main Authors: | Julianto, 吳順來 |
---|---|
Other Authors: | Dzeng,Ren-Jye |
Format: | Others |
Language: | en_US |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/91125188295400824610 |
Similar Items
-
Discount Cash-Flow Analysis on Inventory Model under Trade Credit and Cash Discount
by: Wei-Chieh Chang, et al.
Published: (2007) -
Hybrid time-quality-cost trade-off problems
by: Zsolt T. Kosztyán, et al.
Published: (2018-01-01) -
Discrete Time/cost Trade-off Problem In Project Scheduling
by: Hafizoglu, Ahmet Baykal
Published: (2007) -
Some Applications of Fuzzy Theory in Discounted Cash Flow Problems
by: Huei-Wen Lin, et al.
Published: (2005) -
Stochastic Method of Discounted Cash Flows
by: A. A. Solodov
Published: (2021-03-01)