Discounted Cash Flows Time-Cost Trade-Off Problem Optimization with Uncertainty Cost
碩士 === 國立交通大學 === 土木工程系所 === 102 === Optimization problems in time-cost trade-off (TCTO) analysis of construction management have been traditionally solved by two distinctive approaches: heuristic methods and optimization techniques. Although heuristic methods can handle large-size projects, they do...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | en_US |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/91125188295400824610 |