Discounted Cash Flows Time-Cost Trade-Off Problem Optimization with Uncertainty Cost

碩士 === 國立交通大學 === 土木工程系所 === 102 === Optimization problems in time-cost trade-off (TCTO) analysis of construction management have been traditionally solved by two distinctive approaches: heuristic methods and optimization techniques. Although heuristic methods can handle large-size projects, they do...

Full description

Bibliographic Details
Main Authors: Julianto, 吳順來
Other Authors: Dzeng,Ren-Jye
Format: Others
Language:en_US
Published: 2013
Online Access:http://ndltd.ncl.edu.tw/handle/91125188295400824610
id ndltd-TW-102NCTU5015074
record_format oai_dc
spelling ndltd-TW-102NCTU50150742016-11-20T04:18:03Z http://ndltd.ncl.edu.tw/handle/91125188295400824610 Discounted Cash Flows Time-Cost Trade-Off Problem Optimization with Uncertainty Cost Discounted Cash Flows Time-Cost Trade-Off Problem Optimization with Uncertainty Cost Julianto 吳順來 碩士 國立交通大學 土木工程系所 102 Optimization problems in time-cost trade-off (TCTO) analysis of construction management have been traditionally solved by two distinctive approaches: heuristic methods and optimization techniques. Although heuristic methods can handle large-size projects, they do not guarantee optimal solutions. Recently, artificial intelligence (AI) techniques such as genetic algorithms (GAs), ant colony optimization (ACO), and particle swarm optimization (PSO) have been introduced to overcome the problems associated with (1) large number of variables and constraints; (2) non linearity of time-cost functions; and (3) multi-objective optimization. Traditional time-cost trade-off (TCTO) analysis of construction management assumes the constant value of activities’ cost along the project time span. In fact, the value of money decreases with time or in other words, disregard time value of money. Therefore, discounted cash flows should be considered when solving TCTO optimization problems. Furthermore, in reality, due to different uncertainty, the actual cost of each option is also not known by the manager in advance as a risk. Hence, the total cost of the project may significantly because of these uncertainty. Unfortunately, traditional TCTO analysis also disregards this factor. This study tries to incorporate time value of money and uncertainty into TCTO analysis. Details of model formulation are illustrated by an example project. The model has the following features: (1) optimum solution is guaranteed; (2) precise discrete activity time-cost relationship is used; (3) time value of money is taken into consideration; and (4) uncertainty in the project also are involved. The results show that inclusion of discounted cash flow results in distinct optimal project duration. Nevertheless, through the Monte Carlo simulation, which is in order to involve uncertainty, this proposed model also lead to distinct optimal duration at the certain percentile level. The proposed model for this study can help the practitioners in considering time value of money and uncertainty cost, in order to make the best time-cost decision and to identify risks involved. Dzeng,Ren-Jye 曾仁杰 2013 學位論文 ; thesis 82 en_US
collection NDLTD
language en_US
format Others
sources NDLTD
description 碩士 === 國立交通大學 === 土木工程系所 === 102 === Optimization problems in time-cost trade-off (TCTO) analysis of construction management have been traditionally solved by two distinctive approaches: heuristic methods and optimization techniques. Although heuristic methods can handle large-size projects, they do not guarantee optimal solutions. Recently, artificial intelligence (AI) techniques such as genetic algorithms (GAs), ant colony optimization (ACO), and particle swarm optimization (PSO) have been introduced to overcome the problems associated with (1) large number of variables and constraints; (2) non linearity of time-cost functions; and (3) multi-objective optimization. Traditional time-cost trade-off (TCTO) analysis of construction management assumes the constant value of activities’ cost along the project time span. In fact, the value of money decreases with time or in other words, disregard time value of money. Therefore, discounted cash flows should be considered when solving TCTO optimization problems. Furthermore, in reality, due to different uncertainty, the actual cost of each option is also not known by the manager in advance as a risk. Hence, the total cost of the project may significantly because of these uncertainty. Unfortunately, traditional TCTO analysis also disregards this factor. This study tries to incorporate time value of money and uncertainty into TCTO analysis. Details of model formulation are illustrated by an example project. The model has the following features: (1) optimum solution is guaranteed; (2) precise discrete activity time-cost relationship is used; (3) time value of money is taken into consideration; and (4) uncertainty in the project also are involved. The results show that inclusion of discounted cash flow results in distinct optimal project duration. Nevertheless, through the Monte Carlo simulation, which is in order to involve uncertainty, this proposed model also lead to distinct optimal duration at the certain percentile level. The proposed model for this study can help the practitioners in considering time value of money and uncertainty cost, in order to make the best time-cost decision and to identify risks involved.
author2 Dzeng,Ren-Jye
author_facet Dzeng,Ren-Jye
Julianto
吳順來
author Julianto
吳順來
spellingShingle Julianto
吳順來
Discounted Cash Flows Time-Cost Trade-Off Problem Optimization with Uncertainty Cost
author_sort Julianto
title Discounted Cash Flows Time-Cost Trade-Off Problem Optimization with Uncertainty Cost
title_short Discounted Cash Flows Time-Cost Trade-Off Problem Optimization with Uncertainty Cost
title_full Discounted Cash Flows Time-Cost Trade-Off Problem Optimization with Uncertainty Cost
title_fullStr Discounted Cash Flows Time-Cost Trade-Off Problem Optimization with Uncertainty Cost
title_full_unstemmed Discounted Cash Flows Time-Cost Trade-Off Problem Optimization with Uncertainty Cost
title_sort discounted cash flows time-cost trade-off problem optimization with uncertainty cost
publishDate 2013
url http://ndltd.ncl.edu.tw/handle/91125188295400824610
work_keys_str_mv AT julianto discountedcashflowstimecosttradeoffproblemoptimizationwithuncertaintycost
AT wúshùnlái discountedcashflowstimecosttradeoffproblemoptimizationwithuncertaintycost
_version_ 1718395764395212800