Determining Production Cycle and (n+1)Delivery Policy For a Multi-item System with Failure in Rework, and Production Run Time for Single-vendor-single-buyer Integrated System with Machine Breakdowns, Imperfect Rework, and Multi-delivery Policy.

碩士 === 朝陽科技大學 === 工業工程與管理系 === 103 === This study determines the common cycle run time and (n+1) delivery policy for a multi-item manufacturing system with failure in rework, and production run time for single-vendor-single-buyer integrated system with machine breakdowns, imperfect rework, and multi...

Full description

Bibliographic Details
Main Authors: Ting-Wei Li, 李庭瑋
Other Authors: Yuan-Shyi Chiu
Format: Others
Language:zh-TW
Published: 2014
Online Access:http://ndltd.ncl.edu.tw/handle/35883650669978838730