Determining Production Cycle and (n+1)Delivery Policy For a Multi-item System with Failure in Rework, and Production Run Time for Single-vendor-single-buyer Integrated System with Machine Breakdowns, Imperfect Rework, and Multi-delivery Policy.
碩士 === 朝陽科技大學 === 工業工程與管理系 === 103 === This study determines the common cycle run time and (n+1) delivery policy for a multi-item manufacturing system with failure in rework, and production run time for single-vendor-single-buyer integrated system with machine breakdowns, imperfect rework, and multi...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2014
|
Online Access: | http://ndltd.ncl.edu.tw/handle/35883650669978838730 |