Integrating Value Stream Analysis with Simulation Study to Effectively Improve Production Performance in a Fitness Equipment Factory
碩士 === 朝陽科技大學 === 工業工程與管理系 === 102 === There are three main processes, welding, painting, and assembly, in the manufacturing process of fitness equipment industry. However, welding and assembly process are performed in several workstations. In the past, the performance of the manufacturing only was...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2014
|
Online Access: | http://ndltd.ncl.edu.tw/handle/18999772331804716094 |