Optimal Integration for the Grounding of HV Customer Substation and Utility Power Supply System in the Science Park
碩士 === 國立臺北科技大學 === 電機工程系研究所 === 101 === The typical high voltage (HV) (22.8kV and 11.4kV) utility power supply system (UPSS) in each science park is fed by three-phase four-wire underground cables. The main grounding problem is that the neutral conductors of underground feeder cables are not drawn...
Main Authors: | Nien-Ping Ting, 丁年平 |
---|---|
Other Authors: | Chih-Ju Chou |
Format: | Others |
Language: | zh-TW |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/e7dct3 |
Similar Items
-
Optimal Integration for the Grounding of VHV Supply System and Customer Substations in the Science Park
by: Jia-Hao Chang, et al.
Published: (2013) -
A Study of Protection Coordination Improvement for the HV and VHV Supplied Main Substations
by: Chuang Tung-Kuei, et al. -
Reliability 'H' scheme of HV/MV substations
by: Perić Dragoslav M., et al.
Published: (2015-01-01) -
Evaluation of a Centralized Substation Protection and Control System for HV/MV Substation
by: Ljungberg, Jens
Published: (2018) -
SPD in illumination system of HV air insulated substation
by: Kosorukov Anton, et al.
Published: (2020-01-01)