Optimal Integration for the Grounding of HV Customer Substation and Utility Power Supply System in the Science Park
碩士 === 國立臺北科技大學 === 電機工程系研究所 === 101 === The typical high voltage (HV) (22.8kV and 11.4kV) utility power supply system (UPSS) in each science park is fed by three-phase four-wire underground cables. The main grounding problem is that the neutral conductors of underground feeder cables are not drawn...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/e7dct3 |