碩士 === 國立臺北科技大學 === 電機工程系研究所 === 101 === The typical high voltage (HV) (22.8kV and 11.4kV) utility power supply system (UPSS) in each science park is fed by three-phase four-wire underground cables. The main grounding problem is that the neutral conductors of underground feeder cables are not drawn...

Full description

Bibliographic Details
Main Authors: Nien-Ping Ting, 丁年平
Other Authors: Chih-Ju Chou
Format: Others
Language:zh-TW
Published: 2013
Online Access:http://ndltd.ncl.edu.tw/handle/e7dct3
id ndltd-TW-101TIT05442041
record_format oai_dc
spelling ndltd-TW-101TIT054420412019-05-15T21:02:28Z http://ndltd.ncl.edu.tw/handle/e7dct3 Optimal Integration for the Grounding of HV Customer Substation and Utility Power Supply System in the Science Park 科學園區高壓用戶變電站與電力公司之接地最佳整合研究 Nien-Ping Ting 丁年平 碩士 國立臺北科技大學 電機工程系研究所 101 The typical high voltage (HV) (22.8kV and 11.4kV) utility power supply system (UPSS) in each science park is fed by three-phase four-wire underground cables. The main grounding problem is that the neutral conductors of underground feeder cables are not drawn into customer substations, which lead to detrimental effects on ground fault protection and ground potential rise (GPR) of customer substation. In addition, transfer voltage to customer substation due to ground fault at utility substation is severe, especially supplied by extra high voltage substation (E/S). Moreover, those customers near utility substation are subject to very high lightning and switching surges from utility substations. Obviously, to mitigate these problems, the grounding of both customer substation and UPSS should be improved together. In thesis, we use alternative transient program (ATP) to construct the HV UPSS model and then simulate the characteristics of ground fault, lighting surge and switching surge to get the data of fault current that injected into customer grounding system. Furthermore, we use these data to analyze the electromagnetic chacacteristic of grid of customers by a software package namely the current distribution electromagnetic ground and soil structure analysis (CDEGS) program. The analysis result ensure that the original ground system is highly risky. Obviously, to mitigate these problems, the grounding of both customer substation and UPSS should be improved together. The grounding improved measures include not only reducing ground resistance but also the use of related supporting measures and their integration which produce more effective results. This thesis aim to find all the feasible supporting measures of grounding base on simulated annealing method, the variables include the measures used in customer substation and that of used on UPSS. The costs of the measures will be assessed and optimal integration based of them are implemented to satisfy all the grounding requirements and constraints by lowest total cost. Thereby, all the touch voltage, step voltage and metal-to-metal touch voltage at customer substation will be confined within safe range to assure the personnel safety when ground fault, lightning and switching surges; and the transfer voltage, GPR and magnetic field are all under the limits for protecting equipments from over voltage and magnetic interference. Moreover, the total cost for grounding integration will be minimized, thus this research will upgrade the electric supply safety in science park and conform with economy. Chih-Ju Chou 周至如 2013 學位論文 ; thesis 157 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺北科技大學 === 電機工程系研究所 === 101 === The typical high voltage (HV) (22.8kV and 11.4kV) utility power supply system (UPSS) in each science park is fed by three-phase four-wire underground cables. The main grounding problem is that the neutral conductors of underground feeder cables are not drawn into customer substations, which lead to detrimental effects on ground fault protection and ground potential rise (GPR) of customer substation. In addition, transfer voltage to customer substation due to ground fault at utility substation is severe, especially supplied by extra high voltage substation (E/S). Moreover, those customers near utility substation are subject to very high lightning and switching surges from utility substations. Obviously, to mitigate these problems, the grounding of both customer substation and UPSS should be improved together. In thesis, we use alternative transient program (ATP) to construct the HV UPSS model and then simulate the characteristics of ground fault, lighting surge and switching surge to get the data of fault current that injected into customer grounding system. Furthermore, we use these data to analyze the electromagnetic chacacteristic of grid of customers by a software package namely the current distribution electromagnetic ground and soil structure analysis (CDEGS) program. The analysis result ensure that the original ground system is highly risky. Obviously, to mitigate these problems, the grounding of both customer substation and UPSS should be improved together. The grounding improved measures include not only reducing ground resistance but also the use of related supporting measures and their integration which produce more effective results. This thesis aim to find all the feasible supporting measures of grounding base on simulated annealing method, the variables include the measures used in customer substation and that of used on UPSS. The costs of the measures will be assessed and optimal integration based of them are implemented to satisfy all the grounding requirements and constraints by lowest total cost. Thereby, all the touch voltage, step voltage and metal-to-metal touch voltage at customer substation will be confined within safe range to assure the personnel safety when ground fault, lightning and switching surges; and the transfer voltage, GPR and magnetic field are all under the limits for protecting equipments from over voltage and magnetic interference. Moreover, the total cost for grounding integration will be minimized, thus this research will upgrade the electric supply safety in science park and conform with economy.
author2 Chih-Ju Chou
author_facet Chih-Ju Chou
Nien-Ping Ting
丁年平
author Nien-Ping Ting
丁年平
spellingShingle Nien-Ping Ting
丁年平
Optimal Integration for the Grounding of HV Customer Substation and Utility Power Supply System in the Science Park
author_sort Nien-Ping Ting
title Optimal Integration for the Grounding of HV Customer Substation and Utility Power Supply System in the Science Park
title_short Optimal Integration for the Grounding of HV Customer Substation and Utility Power Supply System in the Science Park
title_full Optimal Integration for the Grounding of HV Customer Substation and Utility Power Supply System in the Science Park
title_fullStr Optimal Integration for the Grounding of HV Customer Substation and Utility Power Supply System in the Science Park
title_full_unstemmed Optimal Integration for the Grounding of HV Customer Substation and Utility Power Supply System in the Science Park
title_sort optimal integration for the grounding of hv customer substation and utility power supply system in the science park
publishDate 2013
url http://ndltd.ncl.edu.tw/handle/e7dct3
work_keys_str_mv AT nienpingting optimalintegrationforthegroundingofhvcustomersubstationandutilitypowersupplysysteminthesciencepark
AT dīngniánpíng optimalintegrationforthegroundingofhvcustomersubstationandutilitypowersupplysysteminthesciencepark
AT nienpingting kēxuéyuánqūgāoyāyònghùbiàndiànzhànyǔdiànlìgōngsīzhījiēdezuìjiāzhěnghéyánjiū
AT dīngniánpíng kēxuéyuánqūgāoyāyònghùbiàndiànzhànyǔdiànlìgōngsīzhījiēdezuìjiāzhěnghéyánjiū
_version_ 1719107743806128128