Determining the production run time for a manufacturing system with stochastic breakdown, (n+1) delivery policy , and partially reworking of defective items
碩士 === 朝陽科技大學 === 工業工程與管理系碩士班 === 101 === This study determines the production run time for a manufacturing system with stochastic breakdown, (n+1) delivery policy, and partially reworking of defective items. The classic Economic Production Quantity (EPQ) model assumes the manufacturing system is pe...
Main Authors: | Ming-Sheng Hsu, 許明生 |
---|---|
Other Authors: | Hong-Dar Lin |
Format: | Others |
Language: | zh-TW |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/04352177791578929342 |
Similar Items
-
Determining production cycle and multi-delivery policy for a multi-item manufacturing system with failure in rework,and production run time with machine breakdowns and imperfect rework.
by: Shin-wei Chen, et al.
Published: (2012) -
Determining Production Cycle and (n+1)Delivery Policy For a Multi-item System with Failure in Rework, and Production Run Time for Single-vendor-single-buyer Integrated System with Machine Breakdowns, Imperfect Rework, and Multi-delivery Policy.
by: Ting-Wei Li, et al.
Published: (2014) -
Exploration Optimal of the Common Cycle Time and Shipping Policy for a Multi-item Fabrication System with Outsourcing and Rework, and Fabrication Run Time with Breakdown, Outsourcing and Rework
by: CHEN, HUI-CUN, et al.
Published: (2019) -
Joint determination of delivery and common cycle policy for system with imperfect rework, and the optimal production-shipment policy with breakdown and rework
by: Chih-Kai Chang, et al.
Published: (2012) -
Study Optimal Common Cycle Time and Delivery Policy for a Multi-item Inventory System with Adjustable Production Rate, Rework, and Production Run Time System with Breakdown, Adjustable Production Rate and Rework
by: WU, CHENG-SIAN, et al.
Published: (2019)