Determining the production run time for a manufacturing system with stochastic breakdown, (n+1) delivery policy , and partially reworking of defective items
碩士 === 朝陽科技大學 === 工業工程與管理系碩士班 === 101 === This study determines the production run time for a manufacturing system with stochastic breakdown, (n+1) delivery policy, and partially reworking of defective items. The classic Economic Production Quantity (EPQ) model assumes the manufacturing system is pe...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2013
|
Online Access: | http://ndltd.ncl.edu.tw/handle/04352177791578929342 |