The study of TRA 49.5mm2 main plumb line changing to 95mm2

碩士 === 建國科技大學 === 電子工程系暨研究所 === 101 === According to the report of “Inspects the overhead catenary system (OCS) equipment to enhance the speed and the technology” made by Taiwan Railways Administration (TRA), it shows the percentage of 51 overhead catenary system (OCS) failure is wire broken duri...

Full description

Bibliographic Details
Main Authors: Lee Hung Fu, 李宏富
Other Authors: 葉忠信
Format: Others
Language:zh-TW
Published: 2013
Online Access:http://ndltd.ncl.edu.tw/handle/78171249032192005709