The Scheduling of Consider the Bottleneck Machine and Robustness

碩士 === 國立雲林科技大學 === 工業工程與管理研究所碩士班 === 100 === If emergency occurs in the production schedule, robust scheduling can continue operating by not affecting the original schedule. However, emergency is not allowed in every schedule. The most efficient method to control the production is to monitor the pe...

Full description

Bibliographic Details
Main Authors: Nip-Chuan Kong, 江立創
Other Authors: Chun-Wei Lin
Format: Others
Language:zh-TW
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/32644827528912394110