The Medium-Term Capacity Planning Problem for TFT-LCD Industry: An Application of Fuzzy Bilevel Programming

碩士 === 國立虎尾科技大學 === 工業工程與管理研究所 === 100 === In this paper, the strategic single-stage multi-plant capacity planning issues for TFT-LCD panel industry is discussed. The TFT-LCD panel manufacturing is divided into Array, Cell, and Module process. As the Array has long production lead time, huge capacit...

Full description

Bibliographic Details
Main Authors: Bo-Xuan Wu, 吳伯軒
Other Authors: Yin-Yann Chen
Format: Others
Language:zh-TW
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/jdq8pz