Forecast Models for Estimating Construction Cost of Box Steel Column

碩士 === 國立高雄應用科技大學 === 土木工程與防災科技研究所 === 100 === ABSTRACT In past, the estimation of construction schedule and cost valuation for box steel column process was used by the empirical method, and led construction schedule to case-by-case plan. In view of this, the study was used construction site of p...

Full description

Bibliographic Details
Main Authors: Chang,Wei-Gang, 張瑋剛
Other Authors: Dr.Tzong-Tzeng Lin
Format: Others
Language:zh-TW
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/80157883674448467749

Similar Items