Forecast Models for Estimating Construction Cost of Box Steel Column
碩士 === 國立高雄應用科技大學 === 土木工程與防災科技研究所 === 100 === ABSTRACT In past, the estimation of construction schedule and cost valuation for box steel column process was used by the empirical method, and led construction schedule to case-by-case plan. In view of this, the study was used construction site of p...
Main Authors: | Chang,Wei-Gang, 張瑋剛 |
---|---|
Other Authors: | Dr.Tzong-Tzeng Lin |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/80157883674448467749 |
Similar Items
-
Seismic Behavior of Eccentric Steel Beam to Box Column connections
by: Chang Hsin-Tzu, et al.
Published: (2004) -
Inelastic behavior of steel box column with two-dimensional internal braces
by: Chang, Tung-Liang, et al.
Published: (1998) -
Response of steel box columns in fire conditions
by: Mahmood Yahyai, et al.
Published: (2017-05-01) -
INELASTIC BEHAVIOR OF STEEL BOX COLUMNS WITH INTERNAL BRACES
by: JUANG, JIA-LIN, et al.
Published: (1997) -
Tapered steel box columns under biaxial loads
by: LU, YE-MAO, et al.
Published: (1992)