Forecast Models for Estimating Construction Cost of Box Steel Column
碩士 === 國立高雄應用科技大學 === 土木工程與防災科技研究所 === 100 === ABSTRACT In past, the estimation of construction schedule and cost valuation for box steel column process was used by the empirical method, and led construction schedule to case-by-case plan. In view of this, the study was used construction site of p...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/80157883674448467749 |