Forecast Models for Estimating Construction Cost of Box Steel Column

碩士 === 國立高雄應用科技大學 === 土木工程與防災科技研究所 === 100 === ABSTRACT In past, the estimation of construction schedule and cost valuation for box steel column process was used by the empirical method, and led construction schedule to case-by-case plan. In view of this, the study was used construction site of p...

Full description

Bibliographic Details
Main Authors: Chang,Wei-Gang, 張瑋剛
Other Authors: Dr.Tzong-Tzeng Lin
Format: Others
Language:zh-TW
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/80157883674448467749
id ndltd-TW-100KUAS8653050
record_format oai_dc
spelling ndltd-TW-100KUAS86530502015-10-13T22:01:10Z http://ndltd.ncl.edu.tw/handle/80157883674448467749 Forecast Models for Estimating Construction Cost of Box Steel Column 鋼結構箱型柱施工費用預估模式之研究 Chang,Wei-Gang 張瑋剛 碩士 國立高雄應用科技大學 土木工程與防災科技研究所 100 ABSTRACT In past, the estimation of construction schedule and cost valuation for box steel column process was used by the empirical method, and led construction schedule to case-by-case plan. In view of this, the study was used construction site of productivity data and impact factor to build up the forecast model for estimating construction cost. The results found the jobs of box column process with high repetition and linear recycle characteristics. Therefore, this study was used by the linear regression method to build a operating productivity prediction model for steel box columns. The forecast model of construction cost estimation was possessed of effective scheduling plan, convenient control budget cost, and available control construction cost. Thus, the forecast model could provide steel structure plants to estimate the optimal construction schedule and cost and to reduce the budget losses. Dr.Tzong-Tzeng Lin 林宗曾 2012 學位論文 ; thesis 67 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立高雄應用科技大學 === 土木工程與防災科技研究所 === 100 === ABSTRACT In past, the estimation of construction schedule and cost valuation for box steel column process was used by the empirical method, and led construction schedule to case-by-case plan. In view of this, the study was used construction site of productivity data and impact factor to build up the forecast model for estimating construction cost. The results found the jobs of box column process with high repetition and linear recycle characteristics. Therefore, this study was used by the linear regression method to build a operating productivity prediction model for steel box columns. The forecast model of construction cost estimation was possessed of effective scheduling plan, convenient control budget cost, and available control construction cost. Thus, the forecast model could provide steel structure plants to estimate the optimal construction schedule and cost and to reduce the budget losses.
author2 Dr.Tzong-Tzeng Lin
author_facet Dr.Tzong-Tzeng Lin
Chang,Wei-Gang
張瑋剛
author Chang,Wei-Gang
張瑋剛
spellingShingle Chang,Wei-Gang
張瑋剛
Forecast Models for Estimating Construction Cost of Box Steel Column
author_sort Chang,Wei-Gang
title Forecast Models for Estimating Construction Cost of Box Steel Column
title_short Forecast Models for Estimating Construction Cost of Box Steel Column
title_full Forecast Models for Estimating Construction Cost of Box Steel Column
title_fullStr Forecast Models for Estimating Construction Cost of Box Steel Column
title_full_unstemmed Forecast Models for Estimating Construction Cost of Box Steel Column
title_sort forecast models for estimating construction cost of box steel column
publishDate 2012
url http://ndltd.ncl.edu.tw/handle/80157883674448467749
work_keys_str_mv AT changweigang forecastmodelsforestimatingconstructioncostofboxsteelcolumn
AT zhāngwěigāng forecastmodelsforestimatingconstructioncostofboxsteelcolumn
AT changweigang gāngjiégòuxiāngxíngzhùshīgōngfèiyòngyùgūmóshìzhīyánjiū
AT zhāngwěigāng gāngjiégòuxiāngxíngzhùshīgōngfèiyòngyùgūmóshìzhīyánjiū
_version_ 1718072011080597504