Operating Strategy of Wastewater Treatment for the Tainan Technology Industrial Park

碩士 === 崑山科技大學 === 環境工程研究所 === 100 === The wastewater treatment plant in Tainan Technology Industrial Park can deal with 42,000 CMD of wastewater totally in plan, which was also planned to be built in three periods of construction with a capacity of 14,000 CMD after completing each one. The discharge...

Full description

Bibliographic Details
Main Authors: Shing-Nan Guo, 郭幸男
Other Authors: Nien-Hsin Kao
Format: Others
Language:zh-TW
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/16001001866882671058