The Study On Applying 8D Method To Customer Complaints-Semiconductor Packaging Industry For Example
碩士 === 義守大學 === 管理學院管理碩士在職專班 === 100 === The company exemplified by this study adopts “8D”(8 disciplines) method for improving their clients’ complaints over semiconductor packaging. Below are two main findings provided by this study: 1. Poor clamping in a wire bonding machine’s window clamp and hea...
Main Authors: | Huang, Chaohui, 黃朝輝 |
---|---|
Other Authors: | Li, Jianxing |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/34001479921325024574 |
Similar Items
-
A study of applying 8D and FMEA to improve customer complaints
by: MA, HSIAO-FENG, et al.
Published: (2013) -
Application of Ford 8D in solving customer complaints
by: 黃順意
Published: (2013) -
The study of Customer Service Operation-take semiconductor package industry as example
by: Tse-Wen Chen, et al.
Published: (2005) -
A Study on the Customer Complaint Response Process using Value Stream Mapping and 8D for Semiconductor Wafer Manufacturing
by: Ying-HsunChen, et al.
Published: (2019) -
The Comparison Study Customer Complaint And Customer Complaint Process To House Broker-Take Taichung As An Example
by: Ming-hsien Lee, et al.
Published: (2004)