The Analysis and Design of the Real-time Information Management System in the Construction Spoil
碩士 === 大葉大學 === 資訊管理學系碩士班 === 100 === Statistics show that the construction spoil in Taiwan area is roughly 3.5 Mm3 for every year during the recently average five years, to control the two stage directions of the application system. Between the logistics and the information flow can't get...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/79810113984685074274 |