Study of Back Analysis and Direct Calculation Method for Tunnel Engineering
博士 === 中華大學 === 土木工程學系博士班 === 100 === The objective of study is that using the explicit analysis developed particularly for the Convergence - Confinement method, the analysis steps and calculation process of the inverse calculation method is proposed, and that using the convergence measurement data...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/28070710134001758298 |