Study of Back Analysis and Direct Calculation Method for Tunnel Engineering

博士 === 中華大學 === 土木工程學系博士班 === 100 === The objective of study is that using the explicit analysis developed particularly for the Convergence - Confinement method, the analysis steps and calculation process of the inverse calculation method is proposed, and that using the convergence measurement data...

Full description

Bibliographic Details
Main Authors: Ming-yi Lin, 林銘益
Other Authors: Yve-line Lee
Format: Others
Language:zh-TW
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/28070710134001758298