SOLVING PROJECT SCHEDULING PROBLEM WITH DEPENDENT RESOURCE CONSTRAINTS

博士 === 雲林科技大學 === 工業工程博士班 === 99 === In the literature most of resource constrained project scheduling problems (RCPSP) consider the resources which are independent with jobs processing sequence (JPS). But in some industrial manufacture and assembling projects, the resources required are not only in...

Full description

Bibliographic Details
Main Authors: Hsian-Jong Hsiau, 蕭獻忠
Other Authors: Chun-Wei R.Lin
Format: Others
Language:en_US
Published: 2011
Online Access:http://ndltd.ncl.edu.tw/handle/62558308438053624826