An Optimal Scheduling Model for Hybrid Flow Shop Lot Streaming Problem with Machine Eligibility and Setup Times - A Case of Solar Cell Industry
碩士 === 東海大學 === 工業工程與經營資訊學系 === 99 === Because of the limited supply of traditional petroleum, many countries are looking for alternative energy sources. Currently, people are applying solar as a critical aspect for the source replacement. In the solar cell industry, the manufacturing system ca...
Main Authors: | Chang, Chin-Wei, 張晉瑋 |
---|---|
Other Authors: | Wang, Li-Chih |
Format: | Others |
Language: | zh-TW |
Published: |
2011
|
Online Access: | http://ndltd.ncl.edu.tw/handle/68442117029833184657 |
Similar Items
-
Lot streaming in hybrid flow shop scheduling
by: Ghasemi, Masood
Published: (2008) -
Hybrid Flow Shop Scheduling Problem with Lot-Streaming and Limited Buffer
by: Tien-Yi Huang, et al.
Published: (2014) -
Energy-Efficient Hybrid Flow Shop Scheduling with Lot Streaming
by: Chou, Yi Han, et al.
Published: (2014) -
Integration of Lot Sizing and Flow Shop Scheduling with Lot Streaming
by: Navid Mortezaei, et al.
Published: (2013-01-01) -
Hybrid Flow Shop Scheduling with Lot Split Problem
by: Chang, Chia-Hsuan, et al.
Published: (2015)