An Optimal Scheduling Model for Hybrid Flow Shop Lot Streaming Problem with Machine Eligibility and Setup Times - A Case of Solar Cell Industry

碩士 === 東海大學 === 工業工程與經營資訊學系 === 99 === Because of the limited supply of traditional petroleum, many countries are looking for alternative energy sources. Currently, people are applying solar as a critical aspect for the source replacement. In the solar cell industry, the manufacturing system ca...

Full description

Bibliographic Details
Main Authors: Chang, Chin-Wei, 張晉瑋
Other Authors: Wang, Li-Chih
Format: Others
Language:zh-TW
Published: 2011
Online Access:http://ndltd.ncl.edu.tw/handle/68442117029833184657

Similar Items