An Optimal Scheduling Model for Hybrid Flow Shop Lot Streaming Problem with Machine Eligibility and Setup Times - A Case of Solar Cell Industry
碩士 === 東海大學 === 工業工程與經營資訊學系 === 99 === Because of the limited supply of traditional petroleum, many countries are looking for alternative energy sources. Currently, people are applying solar as a critical aspect for the source replacement. In the solar cell industry, the manufacturing system ca...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2011
|
Online Access: | http://ndltd.ncl.edu.tw/handle/68442117029833184657 |