Two-stage multiprocessor flow shop scheduling with deteriorating maintenance.

碩士 === 輔仁大學 === 企業管理學系管理學碩士班 === 99 === Scheduling is one of essential dimensions of production management. In order to increase capacity and reduce processing time effectively, flow shop with multiprocessors, FSMP, is often applied to practice industry, such as glass making, iron and steel industry...

Full description

Bibliographic Details
Main Authors: Lee, Huitsung, 李惠宗
Other Authors: Huang, Ronghwa
Format: Others
Language:zh-TW
Published: 2011
Online Access:http://ndltd.ncl.edu.tw/handle/15248990339607542035