The Study of Monitoring on the Structure of the Taiwan High Speed Rail – The Case of Yun-Lin and Tsin-chu Area
碩士 === 雲林科技大學 === 營建工程系碩士班 === 98 === After the completion of the Taiwan High Speed Rail (THSR), the company drew out a list of tasks needed to be done to monitor the structure of the rail before and after the rail starts to be operated. The tasks included the time monitoring of land settlement, the...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/93540416620434341911 |