The feasibility of applying Work Structuring to construction projects in Vietnam
碩士 === 臺灣大學 === 土木工程學研究所 === 98 === Vietnam construction projects are facing many delays and cost overruns. The causes of the delays and overruns are mostly design related problems. These problems could be resolved by a better design management that integrates product design and process design. Howe...
Main Authors: | Nguyen Viet Hung, 阮越雄 |
---|---|
Other Authors: | Luh-Maan Chang |
Format: | Others |
Language: | en_US |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/19228740723271777346 |
Similar Items
-
Emerging M-Commerce ecosystem of Vietnam Post and Telecommunication Corporation (VNPT) – using DoCoMo i-Mode as the Benchmark study
by: Nguyen Viet Hung, et al.
Published: (2010) -
The Feasibility of Applying Phase Change Material in Building Structures in Vietnam
by: Nguyen, Phuc Hung, et al.
Published: (2017) -
Customer Satisfaction Towards the Services of Vietnam Prosperity Bank`s Branches in Hanoi
by: Nguyen Viet Hung, et al.
Published: (2015) -
Critical factors affect users’ intention of using Project Management Information System in Vietnam Farmers’ Union
by: Nguyen Thi Viet Ha, et al.
Published: (2013) -
The Impacts of Leading Change on Academic Research in Universities of Vietnam
by: HA VIET HUNG, et al.
Published: (2010)