The feasibility of applying Work Structuring to construction projects in Vietnam

碩士 === 臺灣大學 === 土木工程學研究所 === 98 === Vietnam construction projects are facing many delays and cost overruns. The causes of the delays and overruns are mostly design related problems. These problems could be resolved by a better design management that integrates product design and process design. Howe...