Current Analysis and Problem Discussion of Turnkey Projects
碩士 === 國立臺灣海洋大學 === 河海工程學系 === 98 === In the traditional procurement model (D/B/B), the design process is separated from construction. However, the separation between the design and construction would lead to a lot of problems such as the design/construction interface, low bid, and change order etc....
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/92286477728372106859 |