The Application of the Block Cutting Method on Power Dispatch Plan

碩士 === 國立屏東科技大學 === 工業管理系所 === 98 === The department of system operation of Taiwan Power Company is responsible for scheduling the power outage repair work, if adopting the plan of the regional time-centralized power outage, the besetment that brought to the users during the power outage period will...

Full description

Bibliographic Details
Main Authors: Yi-Ruei Zeng, 曾奕叡
Other Authors: Yi-Chao Huang
Format: Others
Language:zh-TW
Published: 2010
Online Access:http://ndltd.ncl.edu.tw/handle/55552483871876806489