Construction Planning Optimization Analysis by Double Targets of the Cost and Duration

碩士 === 國立中興大學 === 土木工程學系所 === 98 === In these years, on the related researches of construction planning optimization analysis by double targets of the cost and duration, some method is Exhaustive Method, or Linear Programming to deal with smaller amount of activity description and activity optio...

Full description

Bibliographic Details
Main Authors: Chi-Pei Huang, 黃啟沛
Other Authors: Machine Hsie
Format: Others
Language:zh-TW
Published: 2010
Online Access:http://ndltd.ncl.edu.tw/handle/60040999291982843671
id ndltd-TW-098NCHU5015097
record_format oai_dc
spelling ndltd-TW-098NCHU50150972017-01-07T04:08:22Z http://ndltd.ncl.edu.tw/handle/60040999291982843671 Construction Planning Optimization Analysis by Double Targets of the Cost and Duration 成本與工期雙目標工程規劃最佳化 Chi-Pei Huang 黃啟沛 碩士 國立中興大學 土木工程學系所 98 In these years, on the related researches of construction planning optimization analysis by double targets of the cost and duration, some method is Exhaustive Method, or Linear Programming to deal with smaller amount of activity description and activity option. In the meanwhile, larger amount of activity description and option applies Mathematical Method on its Time Cost Trade Problem. Using Mathematical Method for larger amount of activity description is out of efficiency, because of huge numbers of basic feasible solutions. Therefore, one shall use other method, Evolution Strategy, to find a near-optimal solution, for example, using Genetic Algorithms, or Particle Swarm Optimization. When using Linear Programming to assess suspended time cost trade off problem for a unit, its best solution is not on the corner points usually. For example, to have its solution to be half of a digger, or half of one truck is unreasonable in practical use. If directly to get the integer value, the solution shall fall out of feasible region. Thus, this solution becomes unfeasible answer, or a no good solution within feasible region. In practical construction experience, the amount of needed material belongs to so-called divisibility descision variables. Nevertheless, the amount of man and machine is indivisibility descision variables. The model of my thesis is to apply Integer Programming on examining practical construction planning optimization analysis by double targets of the cost and duration. Herewith, to examining practical construction planning on my thesis, the construction duration is 570 days. Its total cost is $140,064,686. After testing, duration shorten to be 451 days. Its total cost becomes $138,906,064. The compared resolve for construction duration decreased 119 days. The total cost saves $1,158,622. In conclusion, the profit is highly raised in practical construction management. Thereby, this model of Construction Planning Optimization Analysis by Double Targets of the Cost and Duration reserve highly use in practical construction planning. Machine Hsie 謝孟勳 2010 學位論文 ; thesis 116 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立中興大學 === 土木工程學系所 === 98 === In these years, on the related researches of construction planning optimization analysis by double targets of the cost and duration, some method is Exhaustive Method, or Linear Programming to deal with smaller amount of activity description and activity option. In the meanwhile, larger amount of activity description and option applies Mathematical Method on its Time Cost Trade Problem. Using Mathematical Method for larger amount of activity description is out of efficiency, because of huge numbers of basic feasible solutions. Therefore, one shall use other method, Evolution Strategy, to find a near-optimal solution, for example, using Genetic Algorithms, or Particle Swarm Optimization. When using Linear Programming to assess suspended time cost trade off problem for a unit, its best solution is not on the corner points usually. For example, to have its solution to be half of a digger, or half of one truck is unreasonable in practical use. If directly to get the integer value, the solution shall fall out of feasible region. Thus, this solution becomes unfeasible answer, or a no good solution within feasible region. In practical construction experience, the amount of needed material belongs to so-called divisibility descision variables. Nevertheless, the amount of man and machine is indivisibility descision variables. The model of my thesis is to apply Integer Programming on examining practical construction planning optimization analysis by double targets of the cost and duration. Herewith, to examining practical construction planning on my thesis, the construction duration is 570 days. Its total cost is $140,064,686. After testing, duration shorten to be 451 days. Its total cost becomes $138,906,064. The compared resolve for construction duration decreased 119 days. The total cost saves $1,158,622. In conclusion, the profit is highly raised in practical construction management. Thereby, this model of Construction Planning Optimization Analysis by Double Targets of the Cost and Duration reserve highly use in practical construction planning.
author2 Machine Hsie
author_facet Machine Hsie
Chi-Pei Huang
黃啟沛
author Chi-Pei Huang
黃啟沛
spellingShingle Chi-Pei Huang
黃啟沛
Construction Planning Optimization Analysis by Double Targets of the Cost and Duration
author_sort Chi-Pei Huang
title Construction Planning Optimization Analysis by Double Targets of the Cost and Duration
title_short Construction Planning Optimization Analysis by Double Targets of the Cost and Duration
title_full Construction Planning Optimization Analysis by Double Targets of the Cost and Duration
title_fullStr Construction Planning Optimization Analysis by Double Targets of the Cost and Duration
title_full_unstemmed Construction Planning Optimization Analysis by Double Targets of the Cost and Duration
title_sort construction planning optimization analysis by double targets of the cost and duration
publishDate 2010
url http://ndltd.ncl.edu.tw/handle/60040999291982843671
work_keys_str_mv AT chipeihuang constructionplanningoptimizationanalysisbydoubletargetsofthecostandduration
AT huángqǐpèi constructionplanningoptimizationanalysisbydoubletargetsofthecostandduration
AT chipeihuang chéngběnyǔgōngqīshuāngmùbiāogōngchéngguīhuàzuìjiāhuà
AT huángqǐpèi chéngběnyǔgōngqīshuāngmùbiāogōngchéngguīhuàzuìjiāhuà
_version_ 1718406399669567488