Construction Planning Optimization Analysis by Double Targets of the Cost and Duration

碩士 === 國立中興大學 === 土木工程學系所 === 98 === In these years, on the related researches of construction planning optimization analysis by double targets of the cost and duration, some method is Exhaustive Method, or Linear Programming to deal with smaller amount of activity description and activity optio...

Full description

Bibliographic Details
Main Authors: Chi-Pei Huang, 黃啟沛
Other Authors: Machine Hsie
Format: Others
Language:zh-TW
Published: 2010
Online Access:http://ndltd.ncl.edu.tw/handle/60040999291982843671