Drum-Buffer-Rope Scheduling for Transfer Batch in a Flow Shop System
碩士 === 雲林科技大學 === 工業工程與管理研究所碩士班 === 97 === ABSTRACT Drum-buffer-rope (DBR) scheduling proposed by theory of constraints (TOC), it is mainly planed the scheduling aimed at resource constraint, among of due date, work in process, and throughput had conspicuous benefit especially in Drum-Buffer-Rope sc...