Developing a Risk Management Mechanism in the Construction Phase ─ Case Studies on M.R.T. Project
碩士 === 國立臺灣大學 === 土木工程學研究所 === 97 === The life cycle of a construction engineering project includes the phases of planning/ design, construction execution, and completion/operation. Each phase involves its own engineering risk factors. Although efforts are made at each phase to handle the associat...
Main Authors: | Chi-Hsaun Lin, 林紀萱 |
---|---|
Other Authors: | 曾惠斌 |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/03413551803912790234 |
Similar Items
-
Research on Infrastructure Project Risk Management System - Example of MRT Construction Project
by: Yu-Fan Liu, et al.
Published: (2009) -
The Study of Risk Management of MRT Project in Construction Stage – The Owner’s Perspective
by: Yung-Chang Hsieh, et al.
Published: (2010) -
A Study of estimating M.R.T. System Reliability - The case of Taipei M.R.T Electric Multiple Units
by: Jung-Chang Chiu, et al.
Published: (2004) -
MRT project supplier configuration management question and solution
by: Chih-Hsiang Lin, et al. -
MRT project supplier configuration management question and solution
by: Chih-Hsiang Lin, et al.