Developing a Risk Management Mechanism in the Construction Phase ─ Case Studies on M.R.T. Project
碩士 === 國立臺灣大學 === 土木工程學研究所 === 97 === The life cycle of a construction engineering project includes the phases of planning/ design, construction execution, and completion/operation. Each phase involves its own engineering risk factors. Although efforts are made at each phase to handle the associat...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/03413551803912790234 |