Neural Networks for Estimating Duration of Projects with Multiple Paths
碩士 === 國立高雄第一科技大學 === 營建工程所 === 97 === Construction projects are often quite complex with a lot of uncertainty about the required duration. For a project planner, it is important to ensure project completion within the deadline. The critical path method (CPM) uses single-time estimation and does not...