Ready Mixed Concrete Production and Truck Dispatching Planning When RMC Mixer Is Breakdown Unexpectedly under Stochastic Travel Times
碩士 === 國立中央大學 === 土木工程研究所 === 97 === The production of ready mixed concrete (RMC) has been automatic and computerized, but the RMC production scheduling and truck dispatching are still manually determined with staff experience. Consequently, the resulting solution, though feasible, could possibly b...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/63912073161242063709 |