Quantification of the lump-sum-based pay items in Mass Rapid Transit Projects

碩士 === 國立交通大學 === 工學院碩士在職專班工程技術與管理組 === 97 === In a Mass Rapid Transit (MRT) construction project, the construction duration usually is very long and construction cost items (or pay items) are numerous. For those pay items that cannot easily quantified or their associated construction methods have n...

Full description

Bibliographic Details
Main Authors: Huang, Hsin-Hsuan, 黃馨萱
Other Authors: Wang, Wei-Chih
Format: Others
Language:zh-TW
Published: 2009
Online Access:http://ndltd.ncl.edu.tw/handle/74942787312619067842
id ndltd-TW-097NCTU5027013
record_format oai_dc
spelling ndltd-TW-097NCTU50270132015-10-13T15:42:33Z http://ndltd.ncl.edu.tw/handle/74942787312619067842 Quantification of the lump-sum-based pay items in Mass Rapid Transit Projects 捷運工程乙式計價項目量化分析之研究 Huang, Hsin-Hsuan 黃馨萱 碩士 國立交通大學 工學院碩士在職專班工程技術與管理組 97 In a Mass Rapid Transit (MRT) construction project, the construction duration usually is very long and construction cost items (or pay items) are numerous. For those pay items that cannot easily quantified or their associated construction methods have not yet defined, they are treated to be “lump-sum-based pay items”. Such lump-sum-base-dpay items in a MRT project are divided into two categories, namey, Class-I and Class-II. Pay items of Class-I category are common for every MRT project and are such as general requirements, safety protention fees, environmental protection fees, and quality control fees. Pay items of Class-II category vary in different MRT projects. For example, pay items of ground treatment, protection of buildings/structures, site clearance, and demolition only appear in certain MRT projects. This study focuses on the lump-sum-based pay items fallen in Category-I. According to the contractual provisions related to lump-sum-based pay items in current MRT contracts, constractors are required to propose the details and methods for quantifying the lump-sum-based pay items by 30 days before construction. However, without clear specifications or guidelines of the aforementioned quantification method, arguments frequently arise between owners and contractors. Consequently, time and manpower are wasted. If the benefits and disbenefits of using different quantitifcation methods can be investgated, as well as the guidelines are speficed in the MRT contracts, those arguments can be reduced and costs can be saved. Through case studies, this study was to understand the existing building standards of a lump-sum payments based on the situation, for three cases, using different methods to quantify the comparative (including: the proportion of time, the proportion of progress, the proportion of payments made to contractors, etc.), explore different ways to the situation caused by the difference. after analysis of this study,not the same as the method of the results, the total amount of suppliers to apply for there was no significant difference, payments at different times, will lead to loss of interest, in order to follow a fair and simple, Through expert interviews, In accordance with the provisions of the contract sum of the relevant provisions of the proposed more specific, "the proportion of time" as the basis for quantitative analysis, so that the project follow-up Landmark case on pricing can be followed and the purpose of reaching a win-win situation. Wang, Wei-Chih 王維志 2009 學位論文 ; thesis 103 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立交通大學 === 工學院碩士在職專班工程技術與管理組 === 97 === In a Mass Rapid Transit (MRT) construction project, the construction duration usually is very long and construction cost items (or pay items) are numerous. For those pay items that cannot easily quantified or their associated construction methods have not yet defined, they are treated to be “lump-sum-based pay items”. Such lump-sum-base-dpay items in a MRT project are divided into two categories, namey, Class-I and Class-II. Pay items of Class-I category are common for every MRT project and are such as general requirements, safety protention fees, environmental protection fees, and quality control fees. Pay items of Class-II category vary in different MRT projects. For example, pay items of ground treatment, protection of buildings/structures, site clearance, and demolition only appear in certain MRT projects. This study focuses on the lump-sum-based pay items fallen in Category-I. According to the contractual provisions related to lump-sum-based pay items in current MRT contracts, constractors are required to propose the details and methods for quantifying the lump-sum-based pay items by 30 days before construction. However, without clear specifications or guidelines of the aforementioned quantification method, arguments frequently arise between owners and contractors. Consequently, time and manpower are wasted. If the benefits and disbenefits of using different quantitifcation methods can be investgated, as well as the guidelines are speficed in the MRT contracts, those arguments can be reduced and costs can be saved. Through case studies, this study was to understand the existing building standards of a lump-sum payments based on the situation, for three cases, using different methods to quantify the comparative (including: the proportion of time, the proportion of progress, the proportion of payments made to contractors, etc.), explore different ways to the situation caused by the difference. after analysis of this study,not the same as the method of the results, the total amount of suppliers to apply for there was no significant difference, payments at different times, will lead to loss of interest, in order to follow a fair and simple, Through expert interviews, In accordance with the provisions of the contract sum of the relevant provisions of the proposed more specific, "the proportion of time" as the basis for quantitative analysis, so that the project follow-up Landmark case on pricing can be followed and the purpose of reaching a win-win situation.
author2 Wang, Wei-Chih
author_facet Wang, Wei-Chih
Huang, Hsin-Hsuan
黃馨萱
author Huang, Hsin-Hsuan
黃馨萱
spellingShingle Huang, Hsin-Hsuan
黃馨萱
Quantification of the lump-sum-based pay items in Mass Rapid Transit Projects
author_sort Huang, Hsin-Hsuan
title Quantification of the lump-sum-based pay items in Mass Rapid Transit Projects
title_short Quantification of the lump-sum-based pay items in Mass Rapid Transit Projects
title_full Quantification of the lump-sum-based pay items in Mass Rapid Transit Projects
title_fullStr Quantification of the lump-sum-based pay items in Mass Rapid Transit Projects
title_full_unstemmed Quantification of the lump-sum-based pay items in Mass Rapid Transit Projects
title_sort quantification of the lump-sum-based pay items in mass rapid transit projects
publishDate 2009
url http://ndltd.ncl.edu.tw/handle/74942787312619067842
work_keys_str_mv AT huanghsinhsuan quantificationofthelumpsumbasedpayitemsinmassrapidtransitprojects
AT huángxīnxuān quantificationofthelumpsumbasedpayitemsinmassrapidtransitprojects
AT huanghsinhsuan jiéyùngōngchéngyǐshìjìjiàxiàngmùliànghuàfēnxīzhīyánjiū
AT huángxīnxuān jiéyùngōngchéngyǐshìjìjiàxiàngmùliànghuàfēnxīzhīyánjiū
_version_ 1717768190848663552