Quantification of the lump-sum-based pay items in Mass Rapid Transit Projects
碩士 === 國立交通大學 === 工學院碩士在職專班工程技術與管理組 === 97 === In a Mass Rapid Transit (MRT) construction project, the construction duration usually is very long and construction cost items (or pay items) are numerous. For those pay items that cannot easily quantified or their associated construction methods have n...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/74942787312619067842 |