Project Scheduling For Minimizing Total Fuzzy Processing Time Under Resources Constraints

碩士 === 國立勤益科技大學 === 工業工程與管理系 === 97 === There are lots of uncertainties and constraints exist in a new product designing and developing phases such as the ignorance of each operation time or its possible resource consuming. Considering the unduplicated situation, the project scheduling method may be...

Full description

Bibliographic Details
Main Authors: Jyun-Ming Huang, 黃浚銘
Other Authors: Hong-Tau Lee
Format: Others
Language:zh-TW
Published: 2009
Online Access:http://ndltd.ncl.edu.tw/handle/33576704342217300581

Similar Items