Project Scheduling For Minimizing Total Fuzzy Processing Time Under Resources Constraints

碩士 === 國立勤益科技大學 === 工業工程與管理系 === 97 === There are lots of uncertainties and constraints exist in a new product designing and developing phases such as the ignorance of each operation time or its possible resource consuming. Considering the unduplicated situation, the project scheduling method may be...