The Study of percentage of completion of basic design of turnkey project using the example of underground section of Kaohsiung metro civil works.
碩士 === 國立高雄應用科技大學 === 土木工程與防災科技研究所 === 97 === During the tender stage of a turnkey projects, clients usually provide tender documents which have specification and a set of basic design for bidders to prepare the tender proposal. The tender proposal here generally includes ini...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2009
|
Online Access: | http://ndltd.ncl.edu.tw/handle/19185034683084156206 |