Study of Full-Span Launching Method with Pre-Cast Box Girder in Taiwan High Speed Railway Project C270

碩士 === 朝陽科技大學 === 營建工程系碩士班 === 97 === The results of the study strongly recommend that proper and sufficient trainings directly related to the practical applications of the BOT project are essential to minimize or avoid unnecessary delay, especially for the quality control operation in the field. I...

Full description

Bibliographic Details
Main Authors: Li-Ping Lin, 林立平
Other Authors: Tzyy-Shiou Chang
Format: Others
Language:zh-TW
Published: 2009
Online Access:http://ndltd.ncl.edu.tw/handle/79432568759591438313