Cash Flow-based Scheduling Optimization Model for Construction Projects using Constraint Programming
博士 === 雲林科技大學 === 工程科技研究所博士班 === 96 === This research develops a cash flow-based scheduling optimization model for construction projects using constraint programming (CP), and provides contractors to perform financial inspection. Due to different characteristics of scheduling problems, the model fo...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | en_US |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/84552779573339642357 |